Save 25 percent or more on energy costs by replacing older T8 linear fluorescent lamps with LED lighting technology.

High efficiency HVAC, appliance and cooking equipment use 10 to 50 percent less energy than conventional models.

Save energy and money by installing specialty equipment.  Now is your opportunity to help offset project costs and move forward with your project to lower your electricity use.

We work with more than 250 program contractors throughout Ohio who can help you plan and implement energy-efficiency projects.

DATA CENTER

INCENTIVE PROGRAM

Learn more about cash incentive programs that provide                                   reimbursement for data center programs.

Data Center program incentives are available to commercial, industrial and institutional customers of Ohio Edison, The Illuminating Company, and Toledo Edison (FirstEnergy’s Ohio utilities).  Data Center facilities house IT equipment used for data processing, data storage, and communications networking.  These facilities meet the needs of high-density computing equipment, and typically require dedicated cooling systems and uninterruptable power supplies.  Server closets or computer training areas would not qualify as data centers under this program.

Possible data center projects include:

Effective Dates

To qualify for incentives through the Data Center Business Incentive Program, equipment must have been purchased and installed after January 1, 2017, and after the receipt of a formal pre-approval letter from the Program Administrator.

Pre-Approval Requirements

All Data Center incentive requests are subject to review and pre-approval by the program staff prior to the audit work.

Limitations

Incentives available from the Data Center program are shown below, and are limited to 50 percent of the total project cost.  Only new equipment is eligible for incentives under the Data Center Incentive Program.

Program Incentives

Click on the heading below to view the current program incentives and requirements.

Data Center Incentives

Data Center Performance Incentive An incentive of $0.05/kWh saved is offered for projects under the Data Center program.

How Do I Apply For Incentives?

Step 1 – The participant should complete and submit a Data Center Incentive application online and upload required documents through the application portal.  The following documents are required for a pre-approval:

  1. Completed and signed W-9 tax form for the incentive payee.  The W-9 form must be current and dated within the last 24 months.
  2. Scope of work with a summary of the existing and proposed systems
  3. Manufacturers’ specification (cut) sheets for each proposed item to verify that the equipment is eligible.  Please circle or highlight the relevant information on the specification (cut) sheets.
  4. Detailed energy savings analysis/calculations with supporting pre data/measurements (if applicable).
  5. Copy of utility bill to confirm account number and service address.  If desired, the participant may obscure all cost and rate related information.

Step 2 – The Program Administrator will notify the applicant via email when the review is complete and funds have been reserved.  The applicant will have 90 days from the date of the pre-approval letter to complete the project.

Step 3 – Once the project is complete, participants should review their application for any changes and submit the following documents to the Program Administrator for review:

  1. Revised energy savings analysis/calculations (if changes were made during construction).
  2. Detailed, itemized invoices or proofs of purchase for the equipment installed.
  3. Completed letter of attestation.
  4. Post energy data/measurements (if applicable).
  5. If applicable, customers who wish to issue all or a portion of their incentive to a 3rd party should complete a Dual Incentive Payment form.

Supporting technical documentation will be reviewed by Program Administrator and an onsite inspection to verify the installation may be conducted.  Upon receipt and verification of all required documentation, the incentive check will be processed and mailed to the applicant or to an authorized representative, if requested on the application.

Apply Online for Data Center incentives or contact us at 1-866-578-5220.