Save 25 percent or more on energy costs by replacing older T8 linear fluorescent lamps with LED lighting technology.

High efficiency HVAC, appliance and cooking equipment use 10 to 50 percent less energy than conventional models.

Save energy and money by installing specialty equipment.  Now is your opportunity to help offset project costs and move forward with your project to lower your electricity use.

We work with more than 250 program contractors throughout Ohio who can help you plan and implement energy-efficiency projects.

CUSTOM BUILDINGS & EQUIPMENT

Learn more about cash incentive programs that provide reimbursement for custom buildings and equipment.

Jump to Custom Buildings

Custom Equipment

The Custom Equipment Incentive Program is offered to commercial, industrial, governmental and institutional customers of Ohio Edison, The Illuminating Company and Toledo Edison (FirstEnergy’s Ohio utilities).

Eligible Measures

Custom projects include technologies or customer-specific energy efficiency projects that do not meet the eligibility criteria for other business programs.

Eligible projects and technologies may include:

Ineligible projects and technologies include:

Effective Dates

To qualify for incentives through the program, equipment must be new and installed after January 1, 2017.

Pre-Approval Requirements

All custom equipment applications received by the program will require pre-approval before the purchase and installation of materials.

Program Incentives

Click on the heading below to view the current program incentives and requirements.

Custom Equipment Incentives

Custom Equipment Performance Incentive An incentive of $0.05/kWh saved is offered for projects under the Custom Equipment Incentive program.  All Custom Equipment Incentives are limited to 50 percent of the total project cost.
Prescriptive Incentives Equipment & Eligibility Requirements Incentive
Variable Speed Drives (VFDs) Eligible measures include VFDs installed on existing motors that drive fans, pumps, and other suitable applications. $50 per hp controlled
Three Phase Motors Eligible measures include the installation of new premium efficiency motors. $20 per hp

The Program Administrator must receive a copy of all required documentation before incentives are paid.  Annual kWh savings are determined by one of three methods:

  1. Performance-based – demonstrated by an hourly energy simulation model. For LEED-certified projects, and other projects which have a detailed energy model, input and output reports from the software program.
  2. Deemed – demonstrated by submitting program-approved calculators
  3. Measured – demonstrated by site data collection. Direct measurement may take place before or after retrofit, or at both times. In some cases, direct measurement may be combined with engineering calculations to determine electrical energy savings.

How Do I Apply For Incentives?

Step 1 – The participant should complete and submit a Custom Equipment Incentive application online and upload required documents through the application portal.  The following documents are required for a pre-approval:

  1. Completed and signed W-9 tax form for the incentive payee.  The W-9 form must be current and dated within the last 24 months.
  2. Scope of work with a summary of the existing and proposed systems
  3. Manufacturers’ specification (cut) sheets for each proposed item to verify that the equipment is eligible.  Please circle or highlight the relevant information on the specification (cut) sheets.
  4. Detailed energy savings analysis/calculations with supporting pre data/measurements (if applicable).
  5. Copy of utility bill to confirm account number and service address.  If desired, the participant may obscure all cost and rate related information.

Step 2 – The Program Administrator will notify the applicant via email when the review is complete and funds have been reserved.  The applicant will have 90 days from the date of the pre-approval letter to complete the project.

Step 3 – Once the project is complete, participants should review their application for any changes and submit the following documents to the Program Administrator for review:

  1. Revised energy savings analysis/calculations (if changes were made during construction).
  2. Detailed, itemized invoices or proofs of purchase for the equipment installed.
  3. Completed letter of attestation.
  4. Post energy data/measurements (if applicable).
  5. If applicable, customers who wish to issue all or a portion of their incentive to a 3rd party should complete a Dual Incentive Payment form.

Supporting technical documentation will be reviewed by Program Administrator and an onsite inspection to verify the installation may be conducted.  Upon receipt and verification of all required documentation, the incentive check will be processed and mailed to the applicant or to an authorized representative, if requested on the application.

Apply Online for custom equipment incentives or contact us at 1-866-578-5220.

 

Custom Buildings


The Custom Buildings Incentive Program is offered to commercial, industrial, governmental and institutional customers of Ohio Edison, The Illuminating Company and Toledo Edison (FirstEnergy’s Ohio utilities)  for retrofits and new construction projects that include technologies or customer-specific energy efficiency projects that do not meet the eligibility criteria for other business programs.

Eligible Measures

Custom projects include building shell and systems improvements that reduce energy consumption and demand by improving building energy performance. To qualify for incentives, projects must show minimum savings estimates.

Possible custom building projects include:

Effective Dates

To qualify for incentives through the Custom Buildings program, equipment must be new and installed after January 1, 2017.

Pre-Approval Requirements

All custom buildings applications received by the program will require pre-approval before the purchase and installation of materials.

Limitations

Incentives available from the Custom Buildings Incentive Program are shown below, and are limited to the total project cost.  Incentives for smart thermostats are limited to 75 percent of the equipment cost.

New Construction Eligibility Requirements

Eligible new construction and major renovation projects must achieve electrical energy savings exceeding IECC 2009 or ASHRAE 90.1-2007.

Program Incentives

Click on the headings below to view the current program incentives and requirements.

Custom Building Incentives

Custom Building Performance Incentive An incentive of $0.05/kWh saved is offered for projects under the Custom Buildings Incentive program. All Custom Building Incentives are limited to 50 percent of the total project cost. Projects must also achieve a minimum savings of 20,000 kWh/year.
Measure Equipment & Eligibility Requirements Incentive
Building Automation Controls Eligible projects must include the installation of new energy management system that controls lighting, HVAC and other systems. $0.05/kWh
Smart Thermostats Eligible thermostats must be able to control at least three (3) of the following parameters: Fan delays, free cooling, occupancy sensing, heat pump resistance element lockout, humidity control, compressor optimization, or behavioral “coaching”.  Thermostats must control electric heating and/or cooling systems. $0.05/kWh, limited to 75 percent of the thermostat cost.

Annual kWh savings are determined by one of three methods:

  1. Performance-based – demonstrated by an hourly energy simulation model. For LEED-certified projects, and other projects which have a detailed energy model, input and output reports from the software program.
  2. Deemed – demonstrated by submitting program-approved calculators
  3. Measured – demonstrated by site data collection. Direct measurement may take place before or after retrofit, or at both times. In some cases, direct measurement may be combined with engineering calculations to determine electrical energy savings.

How Do I Apply For Incentives?

Step 1 – The participant should complete and submit a Custom Buildings Incentive application online and upload required documents through the application portal.  The following documents are required for a pre-approval (if the project is already complete, applicants should also submit the required documentation listed in Step 3):

  1. Completed and signed W-9 tax form for the incentive payee.  The W-9 form must be current and dated within the last 24 months.
  2. Scope of work with a summary of the existing and proposed systems
  3. Manufacturers’ specification (cut) sheets for each proposed item to verify that the equipment is eligible.  Please circle or highlight the relevant information on the specification (cut) sheets.
  4. Detailed energy savings analysis/calculations.
  5. Copy of utility bill to confirm account number and service address.  If desired, the participant may obscure all cost and rate related information.

Step 2 – The Program Administrator will notify the applicant via email when the review is complete and funds have been reserved.  The applicant will have 90 days from the date of the pre-approval letter to complete the project.

Step 3 – Once the project is complete, participants should review their application for any changes and submit the following documents to the Program Administrator for review:

  1. Revised energy savings analysis/calculations (if changes were made during construction).
  2. Detailed, itemized invoices or proofs of purchase for the equipment installed.
  3. Completed letter of attestation.
  4. If applicable, customers who wish to issue all or a portion of their incentive to a 3rd party should complete a Dual Incentive Payment form.

Supporting technical documentation will be reviewed by Program Administrator and an onsite inspection to verify the installation may be conducted.  Upon receipt and verification of all required documentation, the incentive check will be processed and mailed to the applicant or to an authorized representative, if requested on the application.

Apply online for Custom Building incentives today or contact us at 1-866-578-5220.